Go top
Paper information

Generation flexibility in ramp rates: strategic behavior and lessons for electricity market design

E. Moiseeva, S. Wogrin, M.R. Hesamzadeh

European Journal of Operational Research Vol. 261, nº. 2, pp. 755 - 771

Summary:
A ramp rate usually defines the speed at which an electric power producer can decrease or increase its production in limited time. The availability of fast-ramping generators significantly affects the economic dispatch, especially in the systems with high penetration of intermittent energy sources, e.g. wind power, since the uctuations in supply are common and sometimes unpredictable. One of the regulatory practices of how to impel generators to provide their true ramp rates is to separate the stages of submitting the bids on ramp rate and production. In this paper we distinguish two types of market structures: one-stage - when electric power producers are deciding their production and ramp rate at the same time, or two-stage - when generators decide their ramp rate first, and choose their production levels at the second stage. We employ one-stage and two-stage equilibrium models respectively to represent these market setups and use a conjectured price response parameter ranging from perfect competition to the Cournot oligopoly to investigate the effect of the markett competition structure on the strategic decisions of the generators. We compare these two market setups in a symmetric duopoly case with two time periods and prove that in the two-stage market setup the level of ramp rate is independent of the strategic behavior in the spot market and generally lower than the one offered in the one-stage setup. We also show that the ramp-rate levels in one- and two-stage models coincide at the Cournot oligopoly. We extend the model to asymmetry, several load periods, portfolio bidding, and uncertainty, and show that withholding the ramp rate still occurs in both models. Our findings prove that market regulators cannot rely on only separating the decision stages as an effective measure to mitigate market power and in certain cases it may lead to an adverse effect.


Keywords: OR in energy, ramp rate, strategic decision-making, bilevel programming, equilibrium problems


JCR Impact Factor and WoS quartile: 3,428 - Q1 (2017); 6,400 - Q1 (2022)

DOI reference: DOI icon https://doi.org/10.1016/j.ejor.2017.02.028

Published on paper: September 2017.

Published on-line: February 2017.



Citation:
E. Moiseeva, S. Wogrin, M.R. Hesamzadeh, Generation flexibility in ramp rates: strategic behavior and lessons for electricity market design. European Journal of Operational Research. Vol. 261, nº. 2, pp. 755 - 771, September 2017. [Online: February 2017]


    Research topics:
  • *Short-Term Operation, Market Bidding and Operating Reserves

pdf Preview
Request Request the document to be emailed to you.